Problem, by example
One query, evaluated every minute, with max_error 0.01, failure_probability 0.001:
avg by (job) (quantile_over_time(0.5, data[5m]) / quantile_over_time(0.5, data[5m]) + quantile_over_time(0.9, data[5m]))
The planner keeps this workload's candidates as a memo: groups of logical sub-expressions, each with its implementation candidates (CandidateMemo). We measured it on main (0f7465c96) with a throwaway test that calls LogicalMemo::from_roots, try_populate_pass1 and the expanded_memo test helper:
| After | Memo groups | Implementation candidates | Full candidate DAGs |
|---|---|---|---|
Stage 0 (LogicalMemo::from_roots) |
8 | – | 1 |
Stage 1, Pass 1 (try_populate_pass1) |
8 | 26 | 343 = 7 × 7 × 7 |
Pass 2 window composition + concrete state groups (expanded_memo) |
378 | 2614 | not known (a naive enumerator stopped at 1,000,000) |
In Pass 1, the three quantile groups have 7 candidates each, and the other five groups have one each.
Nothing in the planner can turn the memo back into the representation used before the memo: the vector of every candidate DAG, one complete DAG per query set. So today:
- the DAG viewer can't list the candidate DAGs the memo stands for, or draw any of them except the selected plan;
- no test can check that the memo stands for the same candidate set the whole-workload path enumerated (for Pass 1 here, the same 343 DAGs);
- for a small workload, nobody can price every candidate DAG and check that the MILP's selected plan is the cheapest.
What should exist:
let dags: Vec<Vec<QueryRoot>> = memo::enumerate(&memo, limit) // every choice: one candidate per needed group
.choices
.iter()
.map(|choice| memo::compose(&memo, choice)) // one complete DAG per choice
.collect::<Result<_, _>>()?;
assert_eq!(dags.len(), 343); // Pass 1 memo of the exampleWhy it isn't done today
- Composition exists only in two non-reusable places.
compose_memo_planincrates/integration-tests/src/lib.rsis a test helper. It composes one choice (a group → candidate index map) by replacing each candidate's child-group nodes with their composed children, so each child group is built once and shared.reconstruct_selected_candidatesincrates/plan-selection/src/search/candidates/reconstruction.rsdecodes the MILP's selection. It ispub(in crate::search)and works on the solver's candidate connections, not on aCandidateMemochoice.
- Nothing enumerates choices. The count is not a product over groups: a group several candidates read must take one candidate per plan, a fused candidate implements several groups at once, and which groups are needed depends on the candidates chosen above them.
- The whole-workload path did enumerate. That is
stage1_candidates_of_choiceincrates/logical-asap-optimization/src/workload_candidates.rs, which is being deleted under Reorganize by stage: one memo-based Pass 2, Stage 1 finishes the memo, deployment inputs split by stage, asap-planner as the only entry point #958. Once it is gone, nothing produces the "before" representation.
Proposal
The interfaces go in crates/logical-asap-optimization/src/memo/, next to CandidateMemo.
memo::compose(memo: &CandidateMemo, choice: &MemoChoice) -> Result<Vec<QueryRoot>, ComposeError>. It builds one complete DAG for every query from one choice. It is the production version ofcompose_memo_plan: the test helper is deleted and its callers call this instead. Plan reconstruction should share it or be checked equal to it.MemoChoice. It maps each needed group to one candidate index. A fused candidate sets every group itimplements.memo::enumerate(memo: &CandidateMemo, limit: usize) -> MemoEnumeration { choices: Vec<MemoChoice>, complete: bool }.- It walks from the query roots and picks one candidate per needed group. A group's choice is shared by every candidate that reads it.
- It skips choices that are inconsistent with an earlier fused candidate.
- It stops at
limit, withcomplete: false. - Choices that compose to structurally equal DAGs are counted once.
- Validity stays where it is.
enumerateproduces every composable choice. Accuracy at the query roots, Stage 2 legality and Stage 3 cost stay with the existing validator and stages, as with the whole-workload candidates.
Open choice: should the enumeration also report an exact count past limit? A count needs its own walk (no DAGs built); an upper bound is the product of each group's candidate count. Proposed: report complete and the product as an upper bound in v1, and add an exact count only if the viewer needs it.
Scope and acceptance
In scope: compose, enumerate, MemoChoice, deleting compose_memo_plan, and a "memo to candidate DAGs" algorithm section in docs/design_docs/proposals/planner-layering.md.
Out of scope: drawing the memo and the enumerated DAGs in the DAG viewer (the viewer PR that uses this), and enumerating whole evaluation workloads (the limit binds there).
Acceptance tests:
- Example above, Pass 1 memo.
enumeratereturns 343 choices withcomplete: true. Their composed DAGs equal, as a set, the candidatesstage1_candidates_of_choicebuilds for the same workload, onmainbefore Reorganize by stage: one memo-based Pass 2, Stage 1 finishes the memo, deployment inputs split by stage, asap-planner as the only entry point #958 deletes it. - planner-layering Examples 1–4. Same set equality at Pass 1. After Pass 2, every composed DAG passes the existing plan validator or is rejected with a reason.
- Selected plan. Composing the MILP's selected choice gives the selected plan's logical DAG.
- Small-workload optimality cross-check (devtools, optional). Price every enumerated DAG with Stage 2 and Stage 3. No valid one is cheaper than the MILP's selected plan.
Status and related work
- Planned 2026-10-28 together with the DAG viewer change that draws the memo per stage and lists the enumerated candidate DAGs.
- Related:
- Reorganize by stage: one memo-based Pass 2, Stage 1 finishes the memo, deployment inputs split by stage, asap-planner as the only entry point #958 deletes the whole-workload path, so test 1 must land before that deletion or pin its expected set.
- Memo search solver: MILP over the memo for all cost models #888 is the MILP over the memo; test 4 cross-checks it.
- docs(planner-layering): stage inputs and outputs, whole-workload candidates and memo #977 documents each stage's inputs and outputs with and without the memo.
- test: snapshot planner output over real-world queries in CI #956 adds stage-pipeline snapshots in CI.
- Observed while measuring, to be filed separately: Stage 0 keeps the two
quantile_over_time(0.5, data[5m])as two groups (G2 and G3, structurally equal).share_common_sub_dags(crates/types/src/ir/cse.rs) shares a non-ASAP node only when its schema has a provable unique key, and this per-series quantile's output schema has none.
Activity
zzylol commentedon Oct 28, 2026
Measured while implementing #1009: the Pass 1 memo is a superset of the whole-workload plans, not equal to them. For the example query it stands for 343 DAGs:
compose_logical_candidatebuilds; these are the choices whose candidates all havebudget_share1.Acceptance test 1 is therefore checked as that split. Acceptance 3 (composing the MILP's choice gives the selected plan) needs the selected choice in the document, so it moves to #1003.
zzylol commentedon Oct 28, 2026
Corrected 2026-10-28: production numbers from the stage-pipeline document; earlier numbers came from a test helper without the series-identity column.
The example in this issue was measured with
asap_integration_tests::fixtures::lower_promql/expanded_memo. That lowering omits the PromQL series-identity column, so the per-series quantile had no unique key and the twoquantile_over_time(0.5, data[5m])stayed two groups (G2, G3). The production frontend adds$promql_series_identity, which gives the per-series output a unique key (series identity, timestamp), so they share one group. Production numbers, fromtools/dag-viewer/examples/memo-ratio-of-quantiles.json(mainatd728d05c):Scan dataTimeRange 5mquantile 0.5(both occurrences)G2 / G2quantile 0.9G3 + G4avg by (job)budget_share1)Panes)PaneChainshared-build groups)Panes, 345SharedBuild)For this issue: the
memo_enumeration.rschecks (343 = 27 + 316, 378 groups, 2614 candidates) still run on the helper's lowering, where they hold. In production the Pass 1 memo stands for 49 DAGs, and 16 of them use onlybudget_share1. Whether those 16 are exactly the whole-workload plans has not been checked on the production lowering.