You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The issue model needs a dedicated OKF subtree so agents can navigate from a small index to process guidance or the body rules for one native issue type without loading a monolithic format page.
Request
Create the Ways-of-Working/Issues/ section by relocating the existing issue guidance atomically, then add separate process and type pages. Preserve green navigation and links at every step.
Acceptance criteria
Issues/index.md routes readers into Process and Types subtrees
Process contains concise Format, Lifecycle, Planning, and Relationships pages
Types contains a concise Hierarchy overview plus Epic, PBI, Task, and Bug pages
Every page has title and description frontmatter and one clear conceptual owner
Existing Issue Format and Issue Hierarchy content is relocated without broken inbound links, anchors, navigation, or generated indexes
Workflow remains authoritative for phase definitions
Sub-issues, dependencies, and parallelism have one canonical explanation
The four native operational issue types have distinct, non-duplicative body and lifecycle guidance
All child pull requests pass index, link, lint, clean-build, CI, and Copilot review gates
Technical decisions
Structure: Process and Types are separate indexed subtrees so their child Tasks can proceed independently after the atomic relocation.
Atomic relocation: Moving the existing pages, navigation entries, generated indexes, and every inbound reference is one Task and one pull request. No compatibility stubs remain.
Parallel content: After relocation, Process content and Types content touch separate subtrees and may execute in parallel.
Small pages: Each page states one concept once and links outward rather than copying Workflow or another type page.
Delivery plan
Delivery is tracked through native Task sub-issues. Relocation completes first; Process and Types content then proceed as dependency-free siblings and may run concurrently.
Created the OKF-section child graph. Relocation Task #89 runs first. Process Task #88 and Types Task #87 are siblings blocked by #89 and may run in parallel after it completes. Their separate Process and Types subtrees avoid shared-file conflicts; both must complete before parent Task #86 aligns consuming guidance.
Execution started for relocation Task #89 after bootstrap #82 closed. Its coordinated session is implementing only the atomic OKF path/navigation cutover. Process #88 and Types #87 remain blocked and will start in parallel only after #89 merges.
Relocation PR #91 is ready, green, Copilot-clean, and squash auto-merge enabled. Independent approval is the only remaining gate. Process Task #88 and Types Task #87 remain correctly blocked; both coordinated sessions will start from the post-merge live default branch, in parallel, after #89 closes.
Relocation #89 is complete. Types #87 and Process #88 are now executing in parallel from live main. #87 exclusively owns Issues/Types/; #88 exclusively owns Issues/Process/; each may make only its own subsection change in shared Zensical navigation. Their completion will unblock #86.
PR #93 for Types #87 is ready, green, Copilot-clean, and awaiting only independent approval. Its merge will provide the four canonical type pages and corrected Hierarchy semantics required to unblock Process PR #94.
Source-of-truth synchronization is complete: PR #93 head 6d48368 contains every Types-owned correction found during combined PR #94 review, and PR #94 includes that exact head. #93 is green/clean and approval-blocked; #94 remains draft pending #93 merge and final Process-only reconciliation.
Delivery consolidated by direct user instruction: PR #93 is closed without merge, and draft PR #94 contains the complete final Types and Process trees and closes both #87 and #88. Verified Types-tree parity means no #87 work is missing. The former #87 -> #88 serialization edge is obsolete and removed; #94 remains draft until its final checklist and gates complete.
Aggregate completion verified. All three child Tasks are closed: relocation #89 via PR #91 and combined Types/Process #87/#88 via PR #94. Squash f156c3658969b03250c8af79a452649106aa5df3 is live on origin/main; post-merge workflow https://github.com/MSXOrg/docs/actions/runs/30180399670 passed Build, Links, Lint, and Publish. The Issues/Process and Issues/Types subtrees, frontmatter, navigation, generated indexes, canonical relationship guidance, distinct type pages, and review gates satisfy this PBI acceptance criteria.
Activity
MariusStorhaug commentedon Jul 25, 2026
Created the OKF-section child graph. Relocation Task #89 runs first. Process Task #88 and Types Task #87 are siblings blocked by #89 and may run in parallel after it completes. Their separate Process and Types subtrees avoid shared-file conflicts; both must complete before parent Task #86 aligns consuming guidance.
MariusStorhaug commentedon Jul 25, 2026
Execution started for relocation Task #89 after bootstrap #82 closed. Its coordinated session is implementing only the atomic OKF path/navigation cutover. Process #88 and Types #87 remain blocked and will start in parallel only after #89 merges.
MariusStorhaug commentedon Jul 25, 2026
Relocation PR #91 is ready, green, Copilot-clean, and squash auto-merge enabled. Independent approval is the only remaining gate. Process Task #88 and Types Task #87 remain correctly blocked; both coordinated sessions will start from the post-merge live default branch, in parallel, after #89 closes.
MariusStorhaug commentedon Jul 25, 2026
Relocation #89 is complete. Types #87 and Process #88 are now executing in parallel from live
main. #87 exclusively ownsIssues/Types/; #88 exclusively ownsIssues/Process/; each may make only its own subsection change in shared Zensical navigation. Their completion will unblock #86.MariusStorhaug commentedon Jul 25, 2026
PR #93 for Types #87 is ready, green, Copilot-clean, and awaiting only independent approval. Its merge will provide the four canonical type pages and corrected Hierarchy semantics required to unblock Process PR #94.
MariusStorhaug commentedon Jul 25, 2026
Source-of-truth synchronization is complete: PR #93 head
6d48368contains every Types-owned correction found during combined PR #94 review, and PR #94 includes that exact head. #93 is green/clean and approval-blocked; #94 remains draft pending #93 merge and final Process-only reconciliation.MariusStorhaug commentedon Jul 25, 2026
Delivery consolidated by direct user instruction: PR #93 is closed without merge, and draft PR #94 contains the complete final Types and Process trees and closes both #87 and #88. Verified Types-tree parity means no #87 work is missing. The former #87 -> #88 serialization edge is obsolete and removed; #94 remains draft until its final checklist and gates complete.
MariusStorhaug commentedon Jul 26, 2026
Aggregate completion verified. All three child Tasks are closed: relocation #89 via PR #91 and combined Types/Process #87/#88 via PR #94. Squash
f156c3658969b03250c8af79a452649106aa5df3is live onorigin/main; post-merge workflow https://github.com/MSXOrg/docs/actions/runs/30180399670 passed Build, Links, Lint, and Publish. The Issues/Process and Issues/Types subtrees, frontmatter, navigation, generated indexes, canonical relationship guidance, distinct type pages, and review gates satisfy this PBI acceptance criteria.MariusStorhaug commentedon Jul 26, 2026
Closing this PBI after verified 3/3 child completion and successful aggregate post-merge validation.